PermitPipeline
Firms › NYC architects & engineers › Gensler
+Add your logo

Gensler

✓PortfolioClaimed by this firmA verified representative manages the logo, introduction, website, phone and address on this page. Claim verified 2026-08-15. This is not an endorsement — we verify activity against a public record, we do not vouch for the company.The permit record is not affected. Projects, filing roles, counts, rankings and activity cannot be edited, hidden or removed by the firm.✓PortfolioClaimed by this firmA verified representative manages the logo, introduction, website, phone and address on this page. Claim verified 2026-08-15. This is not an endorsement — we verify activity against a public record, we do not vouch for the company.The permit record is not affected. Projects, filing roles, counts, rankings and activity cannot be edited, hidden or removed by the firm.
Architecture firm · New York City

Gensler is a global architecture, design and planning firm. Our New York studio works across workplace, mixed-use and hospitality, with a particular focus on repositioning existing buildings.

Gensler is a global architecture, design and planning firm. Our New York studio works across workplace, mixed-use and hospitality, with a particular focus on repositioning existing buildings.

Filed 66 days ago
#3
by NYC filing activity
among NYC architects & engineers, 90 days to Aug 16, 2026
106
projects
from 33 filings
16/16
active weeks
weeks with a filing (16 weeks to Aug 16, 2026)

Portfolio

Supplied by the firm.

Financial District workplace, New York, NY

Financial District workplace

New York, NY · 2025

A two-floor workplace for a 300-person team, bui fdvbfvdsfvvsdf dbzfvszxcdf szfvfzbdf nzbfgbvnzbdfgndrbfhx cfcaaaaaacvbfd dfgvbdbgadfgdsfvdsf absvsflt inside a 1970s tower. Raised floors removed, the original waffle slab exposed, and a new stair cut between levels.

Also in PermitPipeline’s permit record View project data
Ellis Street studio, Seattle, WA

Ellis Street studio

Seattle, WA · 2019

A 9,000 sq ft studio conversion in a 1940s warehouse.

Mission Bay repositioning, San Francisco, CA

Mission Bay repositioning

San Francisco, CA · 2024

Re-skinning and amenity floors for a life-sciences conversion.

Portfolio

Supplied by the firm.

Financial District workplace, New York, NY

Financial District workplace

New York, NY · 2025

A two-floor workplace for a 300-person team, bui fdvbfvdsfvvsdf dbzfvszxcdf szfvfzbdf nzbfgbvnzbdfgndrbfhx cfcaaaaaacvbfd dfgvbdbgadfgdsfvdsf absvsflt inside a 1970s tower. Raised floors removed, the original waffle slab exposed, and a new stair cut between levels.

Also in PermitPipeline’s permit record View project data
Ellis Street studio, Seattle, WA

Ellis Street studio

Seattle, WA · 2019

A 9,000 sq ft studio conversion in a 1940s warehouse.

Mission Bay repositioning, San Francisco, CA

Mission Bay repositioning

San Francisco, CA · 2024

Re-skinning and amenity floors for a life-sciences conversion.

Permit-backed projects · PermitPipeline’s independent record
Neighborhood, filing date, scope and declared value are shown here. Exact addresses, owner and contact details and full filing histories are part of the paid product.
Typical project$50K–$6.5M$3.7M typicalLast filed66 days agoManhattan · Aug 5, 2026Last 90 days83 active75 newly filed

Filing activity · 16 weeks to Aug 16, 2026 · peak Jul 2026

APR
MAY
JUN
JUL
AUG

Project mix · by use

Commercial64%
Residential11%
Other25%

Geography · by borough

Manhattan92%
Brooklyn6%
Queens2%

Shared-project connections

#FirmPrimary roleSharedRelative
1Robert Derector AssociatesEngineering10
None on shared filings.

Create a free account to see every firm on these projects and how many projects each one shares.

Owner and developer names, and the projects behind each connection, are part of the Leads product.

Firms that appear on the same New York City permit filings. Association on shared filings, not a proven working relationship.
State licenceNot connectedArchitects are licensed by the NY State Education Department and engineers by the NYC DOB licensing unit. Neither register is part of the New York City permit record, and we do not yet read them.
Standing in its cohort#3New York City architects and engineers, by filing activity, 90 days to Aug 16, 2026
Declared value on file106 of 33 filingsEvery filing carries a stated value.
Repeat working relationships1 firmFirms this one appears with on more than one project, out of 1 in total.

Frequently asked questions

How many NYC projects has Gensler filed?▾
PermitPipeline tracks 106 New York City building-permit projects for Gensler (Mar 2026 to Aug 2026). 83 had filing activity in the last 90 days.
Does Gensler work on commercial or residential projects?▾
Across its tracked New York City filings, 64% of Gensler's projects are commercial and 11% are residential (multifamily, small residential, or single-family). Based on permit records, not self-reported.
Where in New York City does Gensler work?▾
92% of Gensler's tracked New York City projects are in Manhattan.
What is a typical Gensler project worth?▾
Across the 106 filings that state a declared value, Gensler averages $6.0M per filing (declared value on the permit filing, not contract value).
Which firms does Gensler work with most often?▾
Gensler most frequently appears on the same New York City permit filings as Robert Derector Associates. Appearing together indicates association on shared filings, not a proven working relationship.
Is Gensler an architecture firm?▾
Gensler is listed as an architecture firm on its New York City permit filings. Roles on this profile are derived from the role each firm holds on public DOB filings.
Public aggregate — full project records are part of the paid leads product. Ranking, filing activity, project mix and geography were last recomputed Aug 16, 2026. Project counts, declared values and filing dates are read live from NYC DOB filings.
Why does this record start in March 2026?▾
The New York City record begins March 18, 2026. A first filing in that month means the firm was already working when the record opened, not that it started then.
Why does this record start in March 2026?▾
The New York City record begins March 18, 2026. A first filing in that month means the firm was already working when the record opened, not that it started then.
Working with this firm?Monitor this companyOne weekly email when this firm files a new project. No checking back.Monitor up to 10 firms freeIs this your company?Claim this firmAdd your logo, a short introduction, project descriptions and your own contact details.Free
Sources

New York City Department of Buildings permit filings.

Verified

Read directly from NYC DOB filings.

Photography

Photographs are supplied by the firm.

Firm directories by market

Your dashboard

Nothing on this screen appears on your public page.

Activity on your record

  • Aug 07You are #21 by SF filing activity. Among SF architects and engineers, last 90 days
  • Aug 05Record re-checked.Weekly refresh
  • Jul 27A new filing was recorded.New York City DBI

Included with a free claimed profile, and sent monthly by email.

Portfolio editor

Choose which permit-verified projects appear. Provenance is fixed at the moment you choose, and cannot be changed afterwards.

Only projects in the permit record can be featured. There is no way to add a project the record does not contain.

Permit-verified profile

Put the same panel on your own website. It updates itself and stops rendering if the claim lapses.

Permit-verified profile
Gensler
Projects37 from 33 filings
RecordActivity verified from public records
ACTIVITY VERIFIED FROM PUBLIC RECORDS · 10 AUGUST 2026
<script async src="https://getpermitpipeline.com/embed.js"
  data-firm="gensler" data-city="sf"></script>

Portfolio

$399 a year

  • Choose which permit-verified projects appear
  • Photographs on featured projects
  • Captions in your own words
  • The embeddable permit-verified profile

Nothing in the permit record changes, before or after you subscribe.