$2K Noe Valley multifamily renovation
Filed 3 months ago · otc alterations permit · Grade D · Early stage
Revision to bpa: - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref…
$2K
declared value
1
filings to date
Project scope
Revision to bpa: - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa
Why this may be worth pursuing
Filed 3 months ago, with a declared value of $2K. A general contractor is named on the filing; an engineering firm is identified.
Firms on the filing
ArchitectureKnock Arch & Design
Engineering1 firmGeneral contractor1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
1 filing on record, first filed Jul 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$120K Noe Valley single-family renovation
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.