PermitPipeline
Firms › SF architects & engineers › Thomas Podesta Engineer › $75K Potrero Hill tenant improvement

$75K Potrero Hill tenant improvement

Filed 2 months ago · otc alterations permit · Grade B · Early stage

Revision to which stated of as tenant improvement. of (e) office to proposed cafe. revised scope: renovation of (e) office space to proposed cafe and work space layout revision. accessible restroom relocated. window…

$75K
declared value
2
filings to date

Project scope

Revision to which stated of as tenant improvement. of (e) office to proposed cafe. revised scope: renovation of (e) office space to proposed cafe and work space layout revision. accessible restroom relocated. window added. no work to (e) 2nd flr unit. wood to match previously approved. bathroom

Why this may be worth pursuing

Filed 2 months ago, with a declared value of $75K. A general contractor is named on the filing; an architecture firm is identified, and 1 anticipated permit category has not yet appeared.

Filing status does not indicate whether the work has been awarded.

Anticipated permit categories not yet filed

Electrical & low voltage

Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.

Firms on the filing

ArchitectureThomas Podesta Engineer Architecture1 firmGeneral contractor1 firm

Roles are taken from the permit record. Firm names are part of the paid product.

Filing history

2 filings on record, first filed Mar 2025, latest activity Jul 2026. Dated, itemized filing history is part of the paid product.

Not shown on this page

Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Unlock full project details →
Choose Brief, Pro or Team · 14-day trial

Sourced from San Francisco Department of Building Inspection public filings.