Chinatown commercial renovation
Filed 2 months ago · additions alterations or repairs · Grade B · Mid stage
Deferred stair shop drawing submittal per. interior stair, structural detail only
6
filings to date
Why this may be worth pursuing
Filed 2 months ago. A general contractor is named on the filing; 2 architecture firms are identified, an engineering firm is identified, and 1 anticipated permit category has not yet appeared.
Filing status does not indicate whether the work has been awarded.
Anticipated permit categories not yet filed
Elevators
Based on the project scope and filing history. Filing status does not indicate whether the work has been awarded. Categories already covered by a firm on the filing are excluded.
Firms on the filing
ArchitectureMichael Castro
Architecture2 firmsGeneral contractor1 firmEngineering1 firm
Roles are taken from the permit record. Firm names are part of the paid product.
Filing history
6 filings on record, first filed Jun 2025, latest activity Jul 2026.
Dated, itemized filing history is part of the paid product.
Not shown on this page
Exact addressWithheld
Owner and contactWithheld
Every party on every filingWithheld
Permit records and source linksWithheld
Choose Brief, Pro or Team · 14-day trial
Previous project$725K Sunset/Parkside renovation
3 of 3 select projects
Sourced from San Francisco Department of Building Inspection public filings.